Connecting to a sewer

肱二头肌男人-ios加速器

If you're planning to connect or reconnect to one of our sewers, you’ll need our consent before you go ahead. That’s because we need to check the connection will work as planned and that it won’t potentially cause problems such as sewer flooding or pollution. We have legal duties around this, set out in Section 94 of the Water Industry Act 1991 (‘the Act’).

Sewer connections can be made directly to a public sewer or indirectly to a private drain that in turn discharges to a public sewer. Whether your connection is direct, indirect, or if you're seeking to relocate an existing manhole, an application form must be completed.

You can either connect to a local sewer under Section 106 of the Act or in some circumstances to a trunk or chemical sewer under Section 107 of the Act. Connecting to trunk or chemical sewer can be complex and dangerous so we'll need to carry out this work for you.

If your proposals are covered by a planning application, no right of connection to a public sewer exists under the Water Industry Act 1991 until planning approval has been granted and any drainage conditions discharged. We'll therefore be unable to approve a sewer connection application made before planning is granted.

肱二头肌男人-ios加速器

肱二头肌男人-ios加速器

飞鸟加速器,飞鸟加速器官网,飞鸟加速器正版官方入口,  峰哥博客破解版,峰哥博客ios下载,峰哥博客mac下载,峰哥博客打不开  奈飞加速器官方网址,奈飞加速器pc版下载,奈飞加速器不能用了,奈飞加速器vn  vmess节点破解版,vmess节点ios下载,vmess节点安卓下载,vmess节点pc版下载  小火箭加速器mac下载,小火箭加速器永久免费加速,小火箭加速器不能用了,小火箭加速器vn  速鹰加速器npv,速鹰加速器免费永久加速,速鹰加速器免费试用,速鹰加速器跑路了